CONTROLLED DEMOLITION

Brokk, Robotic and controlled. As site clearance is often an integrated part of construction projects, we provide a comprehensive controlled demolition service using remote control Brokk machinery. This method is an efficient, safe and fast way of removing concrete from large and small scale operations, leaving a clear and structurally safe environment for the next stage of the project. Minimises danger from falling rubble and debris. Avoids Hand Arm Vibration. Allows access to areas not possible with traditional methods.

Impressive power to weight ratio allows accessibility in confined spaces – even up staircases

HAND CRUNCHING

Hydraulic Crunching is an extremely effective way to carry out Controlled Demolition of a variety of materials that is also friendly to the environment.

ROBOTIC DEMOLITION

C.D.S are expert controlled demolition contractors, with extensive experience in Brokk robotic demolition.

HYDRO DEMOLITION

Hydro demolition is the favoured method of concrete removal for a majority of projects due to the vibration-free process.

SOFT STRIP

Our operatives are experienced and trained in carrying out ‘soft-strip’ out projects where there is a requirement for non-structural elements of a building to be removed.

NON-EXPLOSIVE BURSTING

Using pressing tools enable controlled demolition without water, noise, dust or vibrations hydraulic Concrete Bursting offers an absolutely silent method of removing large concrete obstructions such as foundations and pile caps. Used in conjunction with a diamond drilling rig to core cut the initial holes, powerful hydraulic rams or bursting heads are then inserted, and expand until the material is forced apart. Once the integrity has been broken down the concrete removal can be undertaken using whatever method is applicable.

WHY USE
CORE DRILLING SPECIALISTS?

Lectus erat, consectetur eu sapien eget rhoncus consectetur sem. Proin cursus, dolor a mollis consectetur, risus dolor fermentum massa, a commodo elit dui sit amet risus.
Maecenas ornare nisl

 

  • A tortor ultrices bibendum
  • Nulla fermentum
  • Metus quis
  • Sodales tristique

CALL FOR A QUOTE:

0150 663 7840

 

RELATED SERVICES

SERVICE TITLE

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

SERVICE TITLE

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

SERVICE TITLE

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

HAMPDEN PARK

EDINBURGH GALLERIES

EDINBURGH ROYAL MILE

Core Drilling Specialists Ltd.

Unit 9,
Inchcross Industrial Estate
Whitburn Rd,
Bathgate
EH48 2HR

Sign Up To Our Mailing List