NEWS

Taymouth Castle

NEWS

Taymouth Castle

Edinburgh-based demolition and drilling specialists, CDS, announces its appointment at the multi-million-pound renovation of Taymouth Castle in Perthshire.

The restoration project, which will be of great historic significance, will comprise the construction of a new north wing, 167 residential properties, a golf clubhouse, an equestrian centre, a new restaurant, two spas, and a 148-bedroom extension to the east wing.

Working on behalf of the Main Contractor, Thomas Johnstone, Core Drilling Specialists have been awarded a demolition and down takings package as well as a structural alterations package that will be instrumental to the renovation of the landmark building that has been a prominent part of the Perthshire landscape since the 19th century. CDS has also been awarded the Fire Stopping package and Builders works in connection with services.

The turnkey service package delivered by CDS will offer a cradle-to-grave solution and will comprise the removal of existing finishes, furnishes, flooring, and non-loadbearing walls. In addition, CDS will also perform specialist cutting techniques to remove load-bearing walls in advance of the formation of new structural door openings. The temporary works for this element of the project will utilise design input from Will Rudd Davidson who will create a bespoke design package for each structural alteration.

Given the complexities associated with a build of this age, CDS will also facilitate the installation of multi-utilities by utilising dry cutting techniques to create penetrations in advance of the services being installed.

Scott Murray, CDS Managing Director, said:

“Our involvement at Taymouth Castle is another huge milestone for the CDS team and we are delighted to offer our support to the main construction programme.

Although the nature of the project presents some challenges due to its unique architectural composition, our expertise in the delivery of specialist drilling services along with our ability to provide a cradle-to-grave solution will allow us to efficiently meet project demands whilst significantly minimising risk to the Main Contractor.

CDS is proud to be part of this prestigious project and we look forward to seeing how this unique piece of architecture transitions into the 21st century”.

CONTACT FORM

Whether you have potential project or just a general enquiry, fill out our contact form and one of our team will get back to you soon.