SCARIFYING

7

What is Scarifying?

Scarifying/ Planning are used to effectively remove laitance, projections, encrustation, scale deposits, colour, rust, and provides great adhesive surface for applying epoxy and cement floor screeds 

Scarifying/ Planning are two different kinds of industrial floor preparation. Each has its own distinctive role, purpose and effect upon a floor.  Both separate machines have a typically aggressive nature and therefore are not really suitable for coating preparation. It is also good for removing waterproof membranes from locations such as car parks and other hard standing areas. Scabbing is a destructive process and is ideal for preparing large areas prior to the application of screeds.

Scarifying or Planning is usually employed in conjunction with industrial vacuum machines to reduce or eliminate dust emission.

However where these machines come into their own is for fast removal of concrete to reduce floor levels. TCT cutters cut grooves in the substrate to provide a very heavy non slip surface.

WHY USE
CORE DRILLING SPECIALISTS?

Lectus erat, consectetur eu sapien eget rhoncus consectetur sem. Proin cursus, dolor a mollis consectetur, risus dolor fermentum massa, a commodo elit dui sit amet risus.
Maecenas ornare nisl

 

  • A tortor ultrices bibendum
  • Nulla fermentum
  • Metus quis
  • Sodales tristique

CALL FOR A QUOTE:

0150 663 7840

 

RELATED SERVICES

INTUMESCENT COATINGS

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

BOARDING SYSTEMS

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

ACOUSTIC SEALING

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

Core Drilling Specialists Ltd.

Unit 9,
Inchcross Industrial Estate
Whitburn Rd,
Bathgate
EH48 2HR

Sign Up To Our Mailing List