Fire Cavity Barriers are installed to prevent the spread of fire and smoke within a building through vulnerable areas such as ceiling spaces, roof spaces, and raised access floors.
UK Building Regulations require buildings to adhere to national standards of compartmentation, wherein spaces and cavities within a building’s structure are divided by Cavity Barriers. This is designed to keep fires in the area where they originated for as long as possible, reducing the risk of fire, smoke, and dangerous gases spreading to other areas of the building.

Today, most buildings will contain many voids and hidden cavities within their structure. Cavity Barriers are therefore of imperative importance.
CDS Fire Protection, offer a range of Cavity Barrier products and installation services. Our Cavity Barriers maintain integrity and performance over the lifespan of a building and can be installed in accordance with other factors such as building size, location, and insurance stipulations.

WHY USE
CORE DRILLING SPECIALISTS?

Lectus erat, consectetur eu sapien eget rhoncus consectetur sem. Proin cursus, dolor a mollis consectetur, risus dolor fermentum massa, a commodo elit dui sit amet risus.
Maecenas ornare nisl

 

  • A tortor ultrices bibendum
  • Nulla fermentum
  • Metus quis
  • Sodales tristique

CALL FOR A QUOTE:

0150 663 7840

 

RELATED SERVICES

INTUMESCENT COATINGS

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

BOARDING SYSTEMS

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

ACOUSTIC SEALING

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasell sed nibh dignissim, cursus tellus sit amet, ultrices mauris. Aliquam

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

May I take this opportunity to thank you all for your efforts during the Christmas and New Year shifts.  The works were not easy by any stretch of the imagination, compounded by adverse weather conditions , working away from home and site conditions that were not ideal.  We completed the works as far as we could and handed back both possessions on time WITHOUT ANY ACCIDENTS OR INCIDENTS which we should be proud of.  We had a couple of high level visits from the client who were content with our efforts and achievements.

Mark Johnson, Senior Project Manager – AMCO Rail

 

HAMPDEN PARK

EDINBURGH GALLERIES

EDINBURGH ROYAL MILE

Core Drilling Specialists Ltd.

Unit 9,
Inchcross Industrial Estate
Whitburn Rd,
Bathgate
EH48 2HR

Sign Up To Our Mailing List